Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Great Western Dam and Spillway <br />Propos a 1 <br />Page 2 of 2 <br /> <br />Many portions of the original Feasibility Study were prepared by <br />Hydro-Triad, Ltd. The City of Broomfield has retained Rocky Mountain <br />Consultants, Denver, Colorado to finalize the Amended Feasibility <br />Study which is herewith being submitted to the CWCB for your con- <br />sideration. <br /> <br />If there are any questions or if any additional information is needed, <br />please contact us. <br /> <br />SincerelYt <br /> <br />CITY OF BROOMFIELD <br /> <br />George DiCiero <br />City Manager <br /> <br />GD:ls <br />Enclosure <br />