My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153976 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153976 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 11:01:26 AM
Creation date
10/5/2006 11:46:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153976
Contractor Name
Boyle Engineering Corporation
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.,W <br /> <br />. <br /> <br />. <br /> <br />v <br /> <br />ARCHITECT/ENGINEER/CONSULTANT <br />WORK AUTHORIZATION EXHIBITS <br /> <br />EXHIBIT A <br /> <br />CDSS Yampa River Documentation & Modeling Update <br />Scope of Work and Schedule <br /> <br />Part I Documentation <br /> <br />Documentation for the State's Colorado Decision Support System (CDSS) planning <br />models is in need of updating. The models have evolved in several phases over <br />approximately eight years. Within each phase, model development for that phase was <br />documented and new sections were added to each basin model's "Final Report" and <br />"Appendices". The resulting documents do an excellent job of recording development <br />history and progress of the projects. However, they do not function well as references <br />for today's versions of the models. <br /> <br />This opinion was confirmed by usability tests conducted at the University of Colorado at <br />Denver (UCD) earlier this year. The study tested volunteer subjects' ability to identify <br />sections of the report relevant to hypothetical study questions, based on table of <br />contents in the San Juan River Basin Water Resources Planning Model Final Report. <br />From the test results and based on their own experience with the report, the authors <br />offered recommendations for modifying structure, organization, and heading content in <br />future CDSS documents. <br /> <br />In addition to structural and organizational improvements, the Yampa River model <br />documentation needs to be updated to reflect the State's most recent modifications to <br />the model. These include use of variable efficiency for irrigation structures, and <br />incorporation of new information on Wyoming's depletions in the Little Snake River <br />basin. <br /> <br />Thus the objectives of this scope of work are to: <br />1. redefine the scope of the Yampa River model documentation and reorganize it to <br />address usability issues that have been identified internally as well as by the <br />UCD study; <br />2. produce a documentation outline and formatting guidelines ("the template") <br />applicable to other CDSS model documents; <br />3. create new documentation of the current Yampa River monthly and daily models <br />that reflects current content of the model. <br /> <br />Task 1 - Develop documentation template <br /> <br />This task will produce an outline for future CDSS Water Resources Planning Model <br />reference manuals. The success of the overall effort depends on clearly identifying the <br />purpose' and need for the documentation ahead of time, and adhering to that vision <br /> <br />Exhibits_new <br /> <br />3/5/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.