My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00260
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:46:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153484
Contractor Name
San Luis Valley Water Conservation District
Contract Type
Grant
Water District
0
County
Rio Grande
Bill Number
FSG
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />RIO GRANDE WATER SUPPLY STUDY - PHASE I - STEP TWO <br /> <br />---------------------------------------------------------------- <br /> <br />Task 11-3 CONTINUED <br /> <br />---------------------------------------------------------------- <br /> <br />Closed Basin, mainstem demands, etco) available at <br />that time. It is envisioned that the <br />modifications will primarily occur to the program <br />logic rather than the program's data sets. <br /> <br />3. LRCWE and MacDougall will review the modeled <br />operating scenarios with the Study Advisors and <br />solicit suggestions for additional refinement 0 <br />Addi tional refinements will be incorporated into <br />the RIBSIM model and tested for proper operation. <br />Model testing will use the most recent version of <br />the model and its data sets available at the time. <br /> <br />4. LRCWE will describe the Step One Study assumptions <br />and the r.evisions to those assumptions made in <br />this task. Also a description of the revision <br />process will be included. MacDougall will review <br />this memorandum. <br /> <br />Work Product: A file memorandum discussing the phase I operation <br />of selected aspects of the Rio Grande Compact and <br />the revisions made during Task II-3. <br /> <br />June 17, 1988 <br /> <br />9 <br /> <br />~ Leonard Rice Consulting Water Engineers,lnc <br />
The URL can be used to link to this page
Your browser does not support the video tag.