My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00260
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:46:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153484
Contractor Name
San Luis Valley Water Conservation District
Contract Type
Grant
Water District
0
County
Rio Grande
Bill Number
FSG
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />RIO GRANDE WATER SUPPLY STUDY - PHASE I - STEP TWO <br /> <br />Task 11-2 CONTINUED <br /> <br />will be incorporated (to a reasonable extent) into <br />the Closed Basin operating scenario, the model re- <br />operated and a second review with Study Advisors <br />conducted. The study budget incorporates the <br />assumption that two revision cycles may be <br />required. <br /> <br />5. LRCWE will describe the Step One operation of the <br />Closed Basin Project, the revision process and <br />resul ts of Task 11-2 in a file memorandum 0 <br />MacDougall will review this memorandum. <br /> <br />Work Product: A file memorandum discussing the Step One <br />operation of the Closed Basin Project and the <br />revisions made during Task 11-2. <br /> <br />June 17, 1988 <br /> <br />7 <br /> <br />~ Leonard Rice Consulting Water Engineers, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.