Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />RIO GRANDE WATER SUPPLY STUDY - PHASE I - STEP TWO <br /> <br />Task 11-2 CONTINUED <br /> <br />will be incorporated (to a reasonable extent) into <br />the Closed Basin operating scenario, the model re- <br />operated and a second review with Study Advisors <br />conducted. The study budget incorporates the <br />assumption that two revision cycles may be <br />required. <br /> <br />5. LRCWE will describe the Step One operation of the <br />Closed Basin Project, the revision process and <br />resul ts of Task 11-2 in a file memorandum 0 <br />MacDougall will review this memorandum. <br /> <br />Work Product: A file memorandum discussing the Step One <br />operation of the Closed Basin Project and the <br />revisions made during Task 11-2. <br /> <br />June 17, 1988 <br /> <br />7 <br /> <br />~ Leonard Rice Consulting Water Engineers, Inc <br />