My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00260
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:46:15 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153484
Contractor Name
San Luis Valley Water Conservation District
Contract Type
Grant
Water District
0
County
Rio Grande
Bill Number
FSG
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Throughout the course of the study, the CWCB will provide overall <br />study management and coordination between the consultants, the <br />local sponsor (SLVWCD), and the study advisors. Technical <br />analyses and written products will be prepared by the consultants <br />in consultation with the CWCB staffo <br /> <br />study Advisors <br /> <br />During the course of the study, representatives of the following <br />organizations will advise the study team on various aspects of <br />the study and are referred to in this POS as study Advisors. <br /> <br />San Luis valley water Conservancy District <br />(local sponsor of Study) <br />Rio Grande Water Conservation District <br />Rio Grande water Users Association <br />Conejos Water Conservancy District <br />Colorado's Rio Grande Compact Commissioner <br />and Engineer (i 0 e. Colorado State Engineer, <br />Colorado Deputy State Engineer) <br />Division Engineer and local water <br />administrators <br /> <br />Schedules <br /> <br />It is contemplated that Step Two activities as outlined in this <br />plan of Study can be completed in 48 weeks 0 A tentative schedule <br />of activities has been attached as Figure 1. Since there are <br />many inter-relationships between tasks, one often finds tasks <br />being performed concurrently. For example, Task II-2 (Closed <br />Basin operation) and Task II-3 (Rio Grande Compact) are performed <br />concurrently since altering the Closed Basin operation will also <br />affect the operation of the Rio Grande Compact. <br /> <br />Written Work Product Schedule <br /> <br />A tentative schedule for submittal of file memoranda and reports <br />is provided below. As indicated, it is anticipated that the <br />written work products will be provided to Study Advisors for <br />review and comment prior to finalizationo <br /> <br /> Schedule of Written Work Products <br /> Week following Study Initiation Subject <br /> Week 5 Draft II-1 Memo <br /> , Draft II-4 Memo <br /> Week 7 Draft II-5 Memo <br /> Week 8 Final II-1 Memo <br /> Week 10 Final II-5 Memo <br /> Week 15 Draft II-2 Memo <br /> Week 17 Draft II-3 Memo <br />June 17, 1988 2 <br /> <br />~ <br /> <br />Leonard Rice Consulting Water Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.