Laserfiche WebLink
<br />.. <br /> <br />. <br /> <br />RIO GRANDE WATER SUPPLY STUDY - PHASE I - STEP TWO <br />PLAN OF STUDY <br /> <br />TABLE OF CONTENTS <br /> <br />INTRODUCTION . . 0 . . . . . . . . . . 0 . . 0 . . . . . 0 0 . I <br /> <br />OBJECTIVE <br /> <br />. . . . . . . . 0 . . . . . . I <br /> <br />STUDY ORGANIZATION AND MANAGEMENT 0 . . . . 0 0 . . . 0 . . . I <br />Study Advisors <br />Schedules <br />Written Work Products <br />Meeting Schedule with Study Advisors <br />Budget <br /> <br />TECHNICAL APPROACH <br /> <br />II-I <br />II-2 <br /> <br />II-3 <br /> <br />II-4 <br /> <br />II-5 <br /> <br />II-6 <br />II-7 <br /> <br />. 0 . 5 <br /> <br />Review of Phase I Study Assumptions. <br />Formulation of Closed Basin Proi ect Modeling <br />Scenarios 0 <br />Refinement of Study Assumptions on Rio Grande <br />Comoact Ooeration. <br />Reconnaissance Investigation of Exchange Potential <br />from Rio Grande Mainstem to Conelos River Basin, <br />Investigation of Rio Grande Mainstem Diversion <br />Demand Assumptions. <br />Modification and Operation of Simulation Modelo <br />Preparation of Rio Grande Water Supply Study Final <br />Report. <br /> <br />~ Leonard Rice Consulting Waler Engineers, Inc. <br />