My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00259
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:45:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153424
Contractor Name
Colorado River Water Conservation District
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Dam Layouts <br /> <br />I <br />I <br />I <br />I <br /> <br />Three dam and reservoir layouts were completed for the si te <br />on West Divide Creek (See Figure IV-4). The largest, an estimate of <br />the maximum reasonable size, was laid out first. The other two <br />layouts were then completed so as to provide 2/3 and 1/3 of the <br />storage available for the largest. The resulting three storage volu- <br />mes ranged from 4,500 to 14,000 acre-feet. Quantities and costs were <br />then calculated based on these three layouts for both earth embankment <br />and roller compacted concrete (RCC) type dams. <br /> <br />4. Flood Hydrology and Spillway Layouts <br /> <br />I <br />I <br />I <br />I <br /> <br />Spillway design floods were developed, and reservoir routing <br />was completed according to the methods described in Section IV, A 4, <br />Hydrologic and Hydraulic Criteria. The peak inflow of the design <br />flood is 22,270 ds. Routing this flood through each of the three <br />reservoir sizes results in a maximum spill-way width of 190 feet for <br />the smallest reservoir and spillwayirldths of 160 and 120 feet for the <br />intermediate and large reservoirs respectively. Spillway sizes are <br />the same for both RCC and earth embankment dams. <br /> <br />5. Outlet Works Design <br /> <br />I <br />I <br />I <br /> <br />The criteria used for the outlet works design are presented <br />in Section IV, A, 4. The two smaller dams utilize a 36 inch concrete <br />outlet pipe. The largest dam requires a 48 inch concrete outlet pipe. <br />Flow control for all three layouts is provided by hydraulically <br />operated sluice gates at the upstream inlet of the outlet pipe. <br />Controls for the gates will be located on the dam crest in all cases. <br />A standard USBR impact type stilling basin is included in the quantity <br />and cost estimates for each dam. <br /> <br />IV-17 <br /> <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br /> <br />6. Quantities and Cost Est:lmates <br /> <br />Estimates of the quantities and costs of materials needed for <br />the major features of each of the six Haystack dams are presented in <br />appendix 01-13 through 01-15 and 02-10 through 02-12. The results are <br />summarized below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.