Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE IV-l <br />UNIT PRICES USED FOR COST ESTIMATING <br /> <br />A. <br /> <br />EMBANKMENT COSTS <br />1. Mob & Demob., Access Roads <br /> <br />2. Stripping <br /> <br />3. Clearing <br /> <br />4. Cutoff Trench Excavation <br /> <br />5. Embankment Material <br /> <br />6. Drains <br /> <br />7. Riprap & Bedding <br /> <br />8. Reseed Disturbed Areas <br /> <br />9. R.C.C. Concrete <br /> <br />B. <br /> <br />OUTLET WORKS COSTS <br />1. Intake Structure-Concrete <br /> <br />2. Conduit-Reinforced Concrete <br />Pipe Including Foundation <br />Preparation <br /> <br />3. Outlet Structure/Energy <br />Dissipator Concrete <br /> <br />4. Reinforced Steel <br /> <br />5. Hydraulic Control Gate <br />with Operator <br /> <br />C. <br /> <br />SPILLWAY COSTS <br />1. RCC-Concrete Lining <br /> <br />2. Cutoff Concrete <br /> <br />3. Pilot Channel Concrete <br /> <br />4. Excavation-Less than <br />Dam Volume <br /> <br />5. Excavation in Excess <br />of Dam Volume <br /> <br />D. <br /> <br />LAND COSTS <br /> <br />E. <br /> <br />ENGINEERING ADMINISTRATION <br />1. Feasibility Studies, <br />Permitting and Design at <br />15% <br /> <br />2. Contingencies @ 25% <br /> <br />UNITS UNIT COST $ <br /> <br />LS <br /> <br />CY <br /> <br />AC <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />AC <br /> <br />CY <br /> <br />CY <br /> <br />FT <br /> <br />CY <br /> <br />LB <br /> <br />LS <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />AC <br /> <br />20% of sum of <br />other embank- <br />ment costs <br /> <br />$2.00 <br /> <br />$1,500.00 <br /> <br />$7.50 <br /> <br />$2.50 <br />$20.00 <br />$30.00 <br />$2,500.00 <br />$26.00 <br /> <br />$500.00 <br /> <br />$5.00/IN O/FT <br /> <br />$500.00 <br /> <br />$0.50 <br /> <br />$15,000 Small Dam <br />$20,000 Medium Dam <br />$25,000 Large Dam <br /> <br />$250.00 <br /> <br />$400.00 <br /> <br />$300.00 <br /> <br />$0.80 <br /> <br />$1. 75 <br /> <br />$2,000 <br /> <br />Total of A, B & C <br /> <br />Total of A, B & C <br />