My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00259
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:45:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153424
Contractor Name
Colorado River Water Conservation District
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE IV-l <br />UNIT PRICES USED FOR COST ESTIMATING <br /> <br />A. <br /> <br />EMBANKMENT COSTS <br />1. Mob & Demob., Access Roads <br /> <br />2. Stripping <br /> <br />3. Clearing <br /> <br />4. Cutoff Trench Excavation <br /> <br />5. Embankment Material <br /> <br />6. Drains <br /> <br />7. Riprap & Bedding <br /> <br />8. Reseed Disturbed Areas <br /> <br />9. R.C.C. Concrete <br /> <br />B. <br /> <br />OUTLET WORKS COSTS <br />1. Intake Structure-Concrete <br /> <br />2. Conduit-Reinforced Concrete <br />Pipe Including Foundation <br />Preparation <br /> <br />3. Outlet Structure/Energy <br />Dissipator Concrete <br /> <br />4. Reinforced Steel <br /> <br />5. Hydraulic Control Gate <br />with Operator <br /> <br />C. <br /> <br />SPILLWAY COSTS <br />1. RCC-Concrete Lining <br /> <br />2. Cutoff Concrete <br /> <br />3. Pilot Channel Concrete <br /> <br />4. Excavation-Less than <br />Dam Volume <br /> <br />5. Excavation in Excess <br />of Dam Volume <br /> <br />D. <br /> <br />LAND COSTS <br /> <br />E. <br /> <br />ENGINEERING ADMINISTRATION <br />1. Feasibility Studies, <br />Permitting and Design at <br />15% <br /> <br />2. Contingencies @ 25% <br /> <br />UNITS UNIT COST $ <br /> <br />LS <br /> <br />CY <br /> <br />AC <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />AC <br /> <br />CY <br /> <br />CY <br /> <br />FT <br /> <br />CY <br /> <br />LB <br /> <br />LS <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />CY <br /> <br />AC <br /> <br />20% of sum of <br />other embank- <br />ment costs <br /> <br />$2.00 <br /> <br />$1,500.00 <br /> <br />$7.50 <br /> <br />$2.50 <br />$20.00 <br />$30.00 <br />$2,500.00 <br />$26.00 <br /> <br />$500.00 <br /> <br />$5.00/IN O/FT <br /> <br />$500.00 <br /> <br />$0.50 <br /> <br />$15,000 Small Dam <br />$20,000 Medium Dam <br />$25,000 Large Dam <br /> <br />$250.00 <br /> <br />$400.00 <br /> <br />$300.00 <br /> <br />$0.80 <br /> <br />$1. 75 <br /> <br />$2,000 <br /> <br />Total of A, B & C <br /> <br />Total of A, B & C <br />
The URL can be used to link to this page
Your browser does not support the video tag.