My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00258
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:45:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0034X
Contractor Name
Basalt Project USBR 1974
Contract Type
Miscellaneous
Water District
0
County
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />CRAnER v <br /> <br />PUMPING PLAN <br /> <br />Estimated Costs <br /> <br />Construction costs <br /> <br />Construction costs of the pumping plan are estimated at $15,840,000 <br />on the basis of reconnaissance design data and January 1973 prices. These <br />costs do not include costs of facilities that would be provided by the <br />water users for treatment and distribution of the municipal and domestic <br />water supplies. The estimated costs are shown below. <br /> <br />. <br /> <br />Item <br />Basalt pumping plants <br />Pump discharge line <br />Diversion structure <br />Substations and switchyards <br />Landis Pipeline <br />Landis Canal <br />Lateral <br />Municipal and domestic trunklines <br />Communication equipment <br />Permanent operating facilities <br />Total <br /> <br />Estimated <br />costs <br />$1,750,000 <br />1,550,000 <br />200,000 <br />l70,OOO <br />4,620,000 <br />2,100,000 <br />170,000 <br />4,800,000 <br />400,000 <br />80,000 <br />15,840,000 <br /> <br />Operation, maintenance, and replacement costs <br /> <br />Project operation, maintenance, and replacement costs have been es- <br />timated at $288,200 annually on the basis of 1970-72 prices. These costs <br />include an amount of $157,600 for electrical energy to drive the pumps. <br />The power costs are based on use of an average of 18,246,400 kilowatt- <br />hours of energy annually and a demand for 3,900 kilowatts of capacity dur- <br />ing the summer and 1,450 kilowatts during the winter. It was a.ssumed that <br />energy would be obtained from the Colorado River Storage Proj ect at the <br />rates of $0.003 a kilowatt-hour and $1.32 a kilowatt-month which are the <br />rates established for Wholesale firm power service from the project. <br /> <br />An emergency reserve fund of $150,000 would be established by the <br />conservancy district. This fund would be kept separate from the other <br />operation and maintenance funds for emergency or special unforeseen op- <br />eration and maintenance costs. <br /> <br />Charges for Ruedi Reservoir storag',water <br /> <br />The cost to the water users for storage water from Ruedi Reservoir <br />is estimated at an average of $119,000 annually, based on $10 for each <br />acre-foot of storage water used. <br /> <br />-. <br /> <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.