My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00258
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:14 AM
Creation date
10/5/2006 11:45:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0034X
Contractor Name
Basalt Project USBR 1974
Contract Type
Miscellaneous
Water District
0
County
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />CHAPrER v <br /> <br />PUMPING PLAN <br /> <br />Landis Canal <br /> <br />The Landis Canal would extend 12.7 miles from the tenninus of the <br />Landis Pipeline. It would ha~e an initial capacity of 50 cubic feet per <br />second and a tenninal capacity of 10 cubic feet per second. The canal <br />would be earth lined except for 3.7 miles of in-line structures. One <br />branch lateral would divert from the canal for distribution of outdoor <br />residential water. This lateral would be earth lined. It would be 1.8 <br />miles long and would have a capacity of 10 cubic feet per second. <br /> <br />Municipal and domestic trunklines <br /> <br />The municipal and domestic trunklines in the pumping plan would be <br />of the Same size and along the same' alignment as in the gravity pipeline <br />plan discussed on page 35. <br /> <br />Communications equipment <br /> <br />Communication or telemetering equipment would be provided so that <br />the Landis Pipeline, pumping plants, and the municipal and domestic trunk- <br />lines could be monitored and operated from one central location, possibly <br />from one of the treatment plants. <br /> <br />. <br /> <br />Permanent operating facilities <br /> <br />Operation and maintenance headquarters would be built in the vicin- <br />ity of Basalt. <br /> <br />Rights-of-way <br /> <br />The construction of the project features would require the acquisition <br />of private land and the withdrawal of some Federal land as shown below. <br /> <br />Landis Pipeline <br />Municipal and domestic <br />trunklines <br />Landis Canal <br />Irrigation laterals <br />Total <br /> <br />Rights-of-way required <br />Privately <br />o'WDed land <br />Nonirri- <br />gated <br />3 <br /> <br />for project <br /> <br />163 <br /> <br />Federal State <br />land land Total <br />24 26 53 <br />5 11 236 <br /> 166 <br />3 104 <br />32 37 559 <br /> <br />Irrigated <br /> <br />57 <br />166 <br />101 <br />327 <br /> <br />163 <br /> <br />. <br /> <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.