Laserfiche WebLink
<br />:1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />project studies, aerial photos, published geologic maps and <br /> <br />other appropriate data and those requested by the CWCB. <br /> <br />The potential use of two or three glacial aquifers thought <br /> <br />to exist in the headwaters of the San Miguel Project <br /> <br />drainage area will be investigated at a reconnaissance level <br /> <br />to determine if these would be a possible source of water <br /> <br />storage for the project. <br /> <br />The potential for obtaining <br /> <br />r <br /> <br />~--_.__., -. <br /> <br />project water supplies from ground water will also be <br /> <br />investigated <br /> <br />at <br /> <br />a <br /> <br />reconnaissance <br /> <br />level. <br /> <br />These <br /> <br />......-.---- <br /> <br />reconnaissance level investigations will include field <br /> <br />inspections, <br /> <br />but <br /> <br />will <br /> <br />not <br /> <br />include <br /> <br />geotechnical <br /> <br />investigations. <br /> <br />If the reconnaissance level investigations <br /> <br />indicate the potential for a viable source of water from <br /> <br />-,-.. -.---- <br /> <br />either the glacial aquifers or from ground water, the <br /> <br />~ <br /> <br />Contractor <br /> <br />will <br /> <br />propose <br /> <br />a <br /> <br />contract <br /> <br />amendment <br /> <br />for <br /> <br />consideration by the CWCB to further evaluate these sources <br /> <br />by means of sub-surface explorations. <br /> <br />Investigation of tM.....p.otential for deve,~ing small-scale <br /> <br />~ l}ydroel ectr ic_ ~!?c:.:-:,=-~ . ir: _..::~2 ~tic:~~!:h othe:=:_ ' pr~j ect_ <br />elements will consist of appraisal-level evaluations of <br /> <br />available <br /> <br />energy <br /> <br />from <br /> <br />flowing water <br /> <br />in <br /> <br />the various <br /> <br />..-- <br /> <br />configurations of project systems, the schedules of water <br /> <br />deliveries and the potential for sale of the electric power <br /> <br />in the study area. <br /> <br />A-39 <br />