My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00257
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153418
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />:1 <br />I <br />II <br />:. <br />I <br />. <br /> <br />TASK NO. 6 - PROJECT ELEMENTS <br /> <br />RATIONALE: <br /> <br />The purpose of this task is to identify potential elements <br /> <br /> <br />for the alternative project configurations by means of a <br /> <br /> <br />preliminary evaluation to screen out those elements not <br /> <br /> <br />suitable for further analysis. The project elements <br /> <br /> <br />included in the recommended High Elevation Collection, <br /> <br /> <br />Storage and Distribution system described in the <br /> <br /> <br />Reconnaissance Report for the San Miquel proiect Rescopinq <br /> <br /> <br />Study will be utilized. Other possible elements will be <br /> <br /> <br />identified. <br /> <br />The Radium Reservoir site will also be considered for <br />development as a wildlife habitat in one of the alternative <br />project configurations. This project feature will not be an <br />element of any of the project operating systems and will not <br />aevelop any portion of the project water supplies for <br />irrigation and M & I uses. <br /> <br />Other potential project elements, such as reservoir sites, <br />conveyance systems, ground water, glacial aquifers, <br /> <br /> <br />hydropower generation, and diversions from Turner Creek, <br /> <br /> <br />will also be considered. The other project elements to be <br /> <br /> <br />considered will be selected by review of previous USER <br /> <br />A-38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.