Laserfiche WebLink
<br />I <br />1 <br />1 <br />1 <br />1 <br />I <br />I <br />I <br />1 <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2. Tabulations of water rights in or owned by the J & M <br />Hughes Ditch, the Farmer's Water Development Company, <br /> <br />the Lone Cone Ditch and Reservoir Company, and the <br /> <br />Lilylands Canal and Reservoir Company indicating their <br />present status. <br /> <br />3. Tabulation of absolute and conditional decreed larger <br /> <br /> <br />water rights in the project area other than the <br /> <br /> <br />project rights listed in items 1 and 2 above. <br /> <br />4. Tabulation of decreed or pending in-stream flow rights, <br />if any, in the study area. <br /> <br />5. Water rights line diagrams for the major streams <br /> <br />involved in the study. <br /> <br />6, Memorandum summarizing task in form of interim section <br /> <br />for final study report. <br /> <br />A-26 <br />