Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br /> <br />the Phase 1 project to obtain the remaining rights and <br />amounts assumed to be available for transfer and utilization <br /> <br /> <br />in this study. The potential yield of these remaining San <br /> <br /> <br />Miguel Project conditional water rights at the proposed new <br /> <br /> <br />points of diversion will be estimated in Task 7. <br /> <br />METHODOLOGY: <br /> <br />1. Compare the preliminary tabulations of water rights <br />compiled in Task 1 with the following to identify <br />discrepancies and lacking information: <br /> <br />a. the July 1, 1984 State Engineer's official Water <br /> <br /> <br />Rights Tabulation listing all decreed and <br /> <br /> <br />conditional water rights in Water Division 4, <br /> <br />b. the July 1, 1984 Abandonment List of water rights <br />in Water Division 4, <br /> <br />-c. water rights listings for Water District 60 <br />obtained from the State Engineer's Water Data <br /> <br />Bank, and <br /> <br />A-21 <br /> <br />