My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153827 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153827 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:03:22 AM
Creation date
10/5/2006 11:45:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153827
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Logan
Bill Number
EIA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Pneumatic crest gate systems, as well as radial gates, lift gates, and flash boards were <br /> <br /> <br />considered, The critical design issue w&lS to keep sand from being washed into the <br /> <br /> <br />Harmony Ditch No, 1. This is the problem with the existing structure. The new design <br />requires the river water to flow over the top of the ditch headgate (low approach velocity <br />with little sand), and at the same time river water flows out the bottom of the radial sluice <br />gate (where high velocity flow bypasses the sand downstream), <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.