My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00253
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00253
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
10/5/2006 11:45:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153579
Contractor Name
Highline Buzzard Ditch Company
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 90-41
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />Agenda Item ge <br />November 9, 1993 <br />Page two <br /> <br />STAFF RECOMMENDATION <br /> <br />The staff recommends: <br /> <br />1. TIIAT A CONSTRUCTION FUND LOAN IN AMOUNT OF $50,000 ( 4%, 30 <br />YEARS) BE APPROVED FOR THE HIGHLINE-BUZZARD DITCH COMPANY <br />FOR THE PURPOSE OF PLACING THE REMAINING PORTION OF THEIR <br />DITCH IN PIPELINE, and <br /> <br />2. TIIAT WAN APPROVAL BE CONTINGENT UPON TIlE CWCB <br />RECEIVING THE COMPLElED SCS FEASIBILITY STUDY, COST ESTIMA lE, <br />PLANS, AND SPECIFICATIONS, and <br /> <br />3. TIIAT TIlE COMPANY BE ALWWED TO CONSOLIDAlE THE <br />REQUESlED WAN WITH AN EXISTING WAN TO THE CWCB ($61,700 <br />APPROXIMAlE BALANCE) AT THE lERMS OF 4% FOR 30 YEARS. <br /> <br />ACTION TAKEN BY THE CWCB BOARD <br /> <br />On November 9, 1993 the ewCB Board took the following action: <br /> <br />1. Approved A CONSTRUCTION FUND LOAN IN AMOUNT OF $50,000 ( 4%, <br />30 YEARS) FOR THE HIGHLINE-BUZZARD DITCH COMPANY FOR THE <br />PURPOSE OF PLACING THE REMAINING PORTION OF THEIR DITCH IN <br />PIPELINE, and <br /> <br />2. Required THAT LOAN APPROVAL BE CONTINGENT UPON THE CWCB <br />RECEIVING TIlE COMPLETED SCS FEASIBILITY STUDY, COST ESTIMA lE, <br />PLANS, AND SPECIFICATIONS. <br /> <br />3. (The Company's request to refinance the existing LOAN TO THE CWCB <br />($61,700 APPROXIMAlE BALANCE) AT THE lERMS OF 4% FOR 30 YEARS, <br />was NOT approved pending Staff analysis of the effect refinancing of loans will have <br />on the Long Range Financial Plan for the Construction Fund.) <br /> <br />C\wp51\ge119,cwc <br />
The URL can be used to link to this page
Your browser does not support the video tag.