Laserfiche WebLink
<br />I <br />I <br />II <br />II <br />II <br />II <br />1I <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />fl <br />II <br />11 <br />[J <br />rl <br /> <br />Item <br /> <br />Quantity <br /> <br />Unit Cost <br /> <br />Unit <br /> <br />Total <br /> <br />Four Mile District <br /> <br /> <br />8" Water Line <br /> <br /> <br />8" Gate Valve and Box <br /> <br /> <br />Highway Bore <br /> <br /> 12,400 L.F. $ 7.00 $ 86,800 <br /> 6 Each 220.00 1,320 <br /> 75 L.F. 50.00 3,750 <br />Sub-Total Construction Cost $ 91,870 <br />Total Construction Cost $ 315,695 <br />+25% Engineering, Legal & Contingencies 78,924 <br />1973 Project Cost $ 394,619 <br />USE $ 394,700 <br /> <br />6-12 <br />