My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00251
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:45 AM
Creation date
10/5/2006 11:45:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153375
Contractor Name
Canon City, City of
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />il <br />'I PROPOSED DISTRIBUTION SYSTEM EXPANSION <br /> FACILITIES TO BE INSTALLED WHEN.REQUIRED BY DEVELOPMENT <br />II COST ESTIMATE <br />Item <br /> Quantity Unit Unit Cost Total <br />'I Within City <br />[I 8" Wa ter Line 8,620 L.F. $ 7.00 $ 60,340 <br />8" Gate Valve and Box 6 Each 220.00 1,320 <br />II Asphalt Replacement 4,200 L.F. 1. 75 7,350 <br />~ Total Construction Cost $ 69,010 <br /> +25% Engineering, Legal & Contingencies 17,253 <br /> 1973 Project Cost $ 86,263 <br />II USE $ 86,300 <br />II Outside City <br />Lincoln Park <br />~ 8" Water Line 13,700 L.L.F. $ 7.00 $ 95,900 <br />8" Gate Valve and Box 7 Each 220.00 1,540 <br />II Asphalt Replacement 12,380 L.F. 1. 75 21,665 <br />Highway Bore 150 L.F. 50.00 7,500 <br />II Sub-Total Construction Cost $ 126,605 <br />[I Sherman Avenue and Maynard Districts <br />8" Water Line 1,560 L.F. $ 7.00 $ 10,920 <br />II 8" Gate Valve and Box 2 Each 220.00 440 <br />Asphalt Replacement 1,560 L.F. 1. 75 2,730 <br />rl Sub-Total Construction Cost $ 14,090 <br />[I East Canon <br /> 8" Water Line 9,400 L.F. $ 7.00 $ 65,800 <br />'I 8" Gate Valve and Box 4 Each 220.00 880 <br /> Asphalt Replacement 9,400 L.F. 1. 75 16,450 <br />] Sub-Total Construction Cost $ 83,130 <br />I 6-11 <br /> ----------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.