Laserfiche WebLink
<br />II <br />II <br />II <br />II <br />II <br /> <br />Stage III. The third stage of construction would consist of the installation of <br /> <br /> <br />an 8 mg storage tank in the vicinity of the 1.5 mg in the northwest area of <br /> <br /> <br />the City. An 18" line would tie this tank into the distribution system. <br /> <br /> <br />As will be discussed later it has been assumed that Canon Chemical will <br /> <br /> <br />have 3 mg of storage to serve its area and Skyline Village will have 1.5 mg <br /> <br /> <br />of storage to serve its area and part of the Morningside Subdivision. This <br /> <br /> <br />would give a total storage of 21.5 mg available for the system which was the <br /> <br /> <br />amount recommended under Section 2, Design Criteria. <br /> <br />II <br /> <br />A major line would be installed east along Park Avenue, south along the eastern <br />edge of Lincoln Park, and back west along the southern edge of Lincoln Park <br />completing a major loop. This line will complete the major lines required <br />in the area south of the river to h~ndle 1993 demands. <br /> <br />l' <br />/1 <br />II <br />II <br />I <br /> <br />Finally a major line would encompas~ the Four Mile area completing a major <br /> <br /> <br />loop to serve this area of future development. <br /> <br />It is recommended that this stage be accomplished in 1980; the estimated <br />cost as shown in Section 6 is $1,031,500 for facilities inside the City and <br />$706,900 for areas outside the City. <br /> <br />Facilities to be Installed when Required by Development. <br /> <br />I <br />, <br /> <br />As shown on Exhibit No.9 there. are a number of lines and facilities that <br /> <br /> <br />are designated to be installed as required by development. <br /> <br />I <br /> <br />As was discussed previously, portionS of the Morningside Development and <br /> <br /> <br />the Canon Chemical and Skyline Village Developments are at higher elevations <br /> <br /> <br />and must be served by pumping stationS and separate storage facilities. <br /> <br /> <br />Cost estimates for the facilities that will be ultimately required to serve <br /> <br /> <br />these areas in 1993 are shown in Section 6 and are shown schematically on <br /> <br /> <br />Exhibit No.9. No time frame has been assigned to the construction of these <br /> <br /> <br />facilities as it will depend entirely on how fast and to what extent these <br /> <br /> <br />areas develop. <br /> <br />I <br /> <br />.1 <br /> <br />-, <br />. <br /> <br />11 <br />. <br /> <br />The other facilities designated on E~hibit No~ 9 to be installed as required <br />by development are 8" lines within msjor loops completing the distribution <br /> <br />'I <br /> <br />5-4 <br />