My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00251
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:17:45 AM
Creation date
10/5/2006 11:45:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153375
Contractor Name
Canon City, City of
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />il <br />II <br />II <br />il <br />II <br />II <br />II <br />II <br />II <br />il <br />II <br />II <br />II <br />fl <br />I <br />J <br />] <br />1 <br /> <br />Projected Costs for Continued Use of Existing Facilities. <br /> <br />The following is the capital expend~ture forecast for the alternate of <br /> <br /> <br />continuing to use the present raw w~ter transmission line in conjunction <br /> <br /> <br />with the pump station to supply raw water to the treatment plant. <br /> <br />Year <br /> <br />1975 <br /> <br />1975 <br /> <br />1981 <br /> <br />1988 <br /> <br />Item <br />Replacement of 40" Line at Intake Facility <br />Expand existing pump station capacity from <br />10.6 to 21.5 mgd <br />Replace 3/4 mile of 30" wooden line with <br />steel line <br />Replace 3/4 mile of 30" wooden line with <br />steel line <br />Present worth in 1973 of Future Capital <br />Expenditure~ @ 5%* <br /> <br />Capital Expenditure <br />$ 76,500 <br /> <br />140,000 <br /> <br />589,050 <br /> <br />871,200 <br /> <br />$1,014,082 <br /> <br />*5% used as this would be the approximate cost of capital to Canon City. <br /> <br />The information on the following page was supplied by the City Clerk of <br /> <br /> <br />Canon City and indicates the expenses and capital outlays incurred by the <br /> <br /> <br />raw water intake, transmission line, and pump station over the past five <br /> <br /> <br />years. The operating expenses were ~edistributed equitably by year and the <br /> <br /> <br />following operating and maintenance costs including salaries were obtained: <br /> <br />Year <br /> <br />Operating and Maintenance Cost <br />Intake, Raw Water Line ~nd Pump Station <br />$24,440 <br />24,050 <br />26,414 <br />29,840 <br />29,353 <br /> <br />Pump Station <br />Power Cost <br /> <br />$1,885 <br />2,168 <br />2,106 <br />2,183 <br />2,513 <br /> <br />The above figures reflect a 21% increase in operating and maintenance costs <br /> <br /> <br />over the past 4 years. In projecting future operating and maintenance costs <br /> <br /> <br />over the next 20 years, it was assumed that expenses would increase at a rate <br /> <br /> <br />of 6% annually. Maintenance costs were decreased in 1982 and 1989 reflecting <br /> <br />1967 <br />1968 <br /> <br />1969 <br /> <br />1970 <br /> <br />1971 <br /> <br />3-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.