My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00250
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C143614
Contractor Name
Rocky Mountain Consultants
Contract Type
Grant
Water District
0
County
Boulder
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />.. <br /> <br />. <br /> <br />. <br /> <br />I <br /> <br />2. Storage reservoir, special requirements for selective withdrawal, etc. <br /> <br />. <br /> <br />Following the tabulation of all of the data presented in the foregoing cost <br /> <br />analysis, plans will be evolved based on the utilization of Marshall <br /> <br />. <br /> <br />Reservoir, Baseline Reservoir, Panama Reservoir, and the proposed Coal <br /> <br />Creek Reservoir site pertaining to the ability of these reservoirs to serve <br /> <br />I <br /> <br />as a source of water for the Coal Creek municipalities. The analysis will <br /> <br />I <br />~ <br />I <br />~ <br /> <br />include the general enlargement potential, the general cost associated with <br /> <br />purchasing or constructing these reservoirs, establ ishing filter treatment <br /> <br />plants adjacent to these reservoirs, and constructing transmission lines <br /> <br />from these reservoirs to the various municipalities. From this information, <br /> <br />general costs can be derived for comparing the suitability of use of each <br /> <br />of these reservoirs as a supply of water for Coal Creek municipalities. <br /> <br /> <br />A large portion of this work has been completed and was presented in the <br /> <br />Coal Creek Dam and Reservoir Feasibil ity Study, Phase I. This data will <br /> <br />be updated, correlated with the water quality tests taken at each of the <br /> <br />sites and related back to e~ch of the municipalities' ability to pay for the <br /> <br />~ <br />\ <br />I <br />I <br />~ <br />I <br />I <br />I <br />I <br />I <br />~ <br />I <br /> <br />purchase of these projects with revenue bonds, general obligation bonds, <br /> <br />tap fees, water rates, and possible water sales to other agencies. <br /> <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.