My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00250
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C143614
Contractor Name
Rocky Mountain Consultants
Contract Type
Grant
Water District
0
County
Boulder
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />il , <br />iil <br />ill <br />ldJ <br />dI <br />iii <br />.. <br />lit <br />OJ <br />d <br />d <br />mtI <br />\ <br />!II <br />I <br />III <br />.. <br />, <br />I <br />- <br />-. <br />I <br />. <br />d <br />!:;.'...-- <br />III <br /> <br />. . <br /> <br />V. Water <br /> <br />A. Water Requirements <br /> <br />In previous reports the water requirements of the municipalities have been <br /> <br />set forth. These requirements will be checked with the previous data collected <br /> <br />by the Denver Regional Council of Governments and Rocky Mountain Consultants, <br /> <br />Inc., and updated with last years water demands. <br /> <br />B. Surface Water Supply <br /> <br />Again this data has been publ ished in previous reports and will be updated; <br /> <br />In addition, pertinent court decisions will be included as appendices, i.e., <br /> <br />rul ings from the Division 1 Water Court relating to recent transfer of decrees. <br /> <br />Also letters from other agencies that could serve water to the Coal Creek <br /> <br />municipalities will be included. These agencies will include but not be <br /> <br />limited to the City of Denver, the City of Boulder, Northern Colorado Water <br /> <br />Conservancy District, and the Six Cities Subdistrict. <br /> <br />C. Water Rights <br /> <br />This information has been completed over a 20 year period and was presented in <br /> <br />the Coal Creek Dam and Reservoir Feasibility Study, Phase I, presented to your <br /> <br />office on October 10, 1973. A copy of this tabulation will be included in <br /> <br />th i s report. <br /> <br />D. Water Utilization <br /> <br />1. Amount available to project. <br /> <br />The transferabil ity of the water rights on Coal Creek and South Boulder <br /> <br />Creek has already been determined to a general degree. Revised cost <br /> <br />figures will be included to reflect the effect of the Standley Reservoir <br /> <br />condemnation and increased prices of Colorado Big Thompson water. In <br /> <br />addition, if water can be obtained from the agencies listed in Chapter V, <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.