My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153960 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153960 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153960
Contractor Name
Riverside Technology Inc.
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Table 3. Anticipated level of effort from Division 1 for Task 91 activities. <br /> <br /> <br />91.1 Well Tabulation and Preliminary <br />Groundwater Service Areas <br /> <br />1 <br /> <br />0.5 <br /> <br />5 <br /> <br />91.2 Preliminary Irrigation Service <br />Area Mapping and Initial <br />Contacts <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />91.3 Mapping and Irrigation Service <br />Areas and Verifying Irrigated <br />field Boundaries, Crop Types <br />with Water Users <br /> <br />4 <br /> <br />2 <br /> <br />4 <br /> <br />Total <br /> <br />2 <br />8 <br /> <br />0.5 <br />4 <br /> <br />2 <br />12 <br /> <br />91.4 Review and Final Ma in <br /> <br />Task 92 - Review the Division 1 Well Location Program Activities <br /> <br />Objective: <br /> <br />Review and provide input to Division 1 Well Location Program to facilitate integration of results <br />in the SPDSS. <br /> <br />Comment: <br /> <br />The well location program is the responsibility of Division 1 personnel. The Contractor's <br />responsibility in this task is to review and provide input to the process. <br /> <br />Approach: <br /> <br />92.1 Consultation With Division 1. The Contractor will consult with Division 1 personnel <br />regarding the approach and requirements for data products, and for keeping abreast of <br />progress. Anticipated are two meetings to be held at Division 1 offices and four meetings via <br />telephone. <br /> <br />Deliverables: <br /> <br />92.1 Meeting notes between Contractor and Division 1 personnel. <br /> <br />Task 94 - GIS Database Development <br /> <br />Objective: <br /> <br />Obtain and process into ArcView format the GIS coverages listed in Table 4, including <br />boundaries, river and water distribution systems, local government, climate and other types of <br />GIS data, and incorporate coverages developed in Tasks 90, 89 and 91. Data format will be <br />compatible with existing CDSS GIS data products. <br /> <br />Page 12 of 26 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.