Laserfiche WebLink
<br /> <br />. <br /> <br />Vl <br />-l <br /> <br />. <br /> <br />. <br /> <br />16,048 <br />967 <br />138 <br /> <br /> <br />Summary of Juniper project cost allocations and repayment <br />(Un! t--$l, 000 ) <br />Fish and Recrea- <br />Irrigation Power wildlife tion <br /> <br />119,842 <br /> <br />287 <br /> <br />18,650 <br />(Not estimated) <br />101,192 <br /> <br />119,Cl42 <br /> <br />287 <br /> <br />287 <br /> <br />2,117 <br /> <br />7,557 <br /> <br />Cost', allocations <br />Construction costs <br />Reimbursable in~erest during <br />construction.!! <br />Annual operation, maintenance, <br />and replacement costs <br />Repayment <br />Construction costs <br />Irrigators <br />Ad valorem tax revenues <br />Power revenues <br />Nonreimbursable _ ' <br />Total <br />Interest during construction <br />Power revenues <br />Annual operation, maintenance, <br />and replacement costs <br />Irrigators <br />Power revenues <br />Nonreimbursable <br />Total <br />y. Computed at 2.936 percent. <br />g; Costs would be repaid with interest, <br /> <br />5 <br /> <br />102 <br /> <br />Y16,048 <br /> <br />16,048 , <br />gj 967 <br /> <br />2,117 <br />2,117 <br /> <br />7,557 <br />7,557 <br /> <br />138 <br />138 <br /> <br />5 <br />5 <br /> <br />102 <br />102 <br /> <br />assumed for this report to be 2.936 percent. <br /> <br />~ <br />I <br />a <br /> <br />'U <br />5 <br />