My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00239
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0035X
Contractor Name
Juniper Project USBR 1963
Contract Type
Miscellaneous
Water District
0
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />CHAPTER II <br /> <br />COMPREHENSIVE PLAN <br /> <br />Deadman Bench Canal.--Average monthly and total seasonal irrigation <br />water requirements at various points along Deadman Bench Canal, including <br />the requirements of the Artesia, Pinyon, and Sunbeam C~nals, were first <br />estimated on the assumption that the Artesia Canal would be served <br />directly from the Deadman Bench Canal without storage regulation at <br />Artesia Reservoir. These average requirements were then adjusted to <br />determine peak requirements and to coordinate with the operation of <br />Artesia Reservoir. Derivation of these average monthly requirements is <br />shown on the following page. <br /> <br /> <br /> <br /> <br />. <br /> <br /> <br />~h <br /> <br />. 0, <br /> <br />...' <br /> <br />Afh <br />'" <br /> <br />~ <br /> <br />l <br /> <br />~' <br />._~ <br /> <br />,., <br /> <br />Looking southwest along Utah Highway 45 at Juniper project <br />lands on Deadman Bench about 6 miles north of Bonanza, <br />Utah. <br /> <br />The average July diversion requirements and the peak canal capacity <br />requirements of Deadman Bench Canal with and without the Artesia Canal <br />requirements, are summarized below for the month of July. <br /> <br />. <br /> <br />Artesia Canal <br />Deadman Bench Canal <br />Without Artesia Canal requirements <br />With Artesia Canal requirements <br /> <br />Acre- <br />feet <br />17,400 <br /> <br />Estimated <br />peak capacity <br />requirement <br />at canal head <br />(second- <br />feet ) <br />370 <br /> <br />Second- <br />feet <br />283 <br /> <br /> <br />97,1100 <br />1111.800 <br /> <br />1,587 <br />1,870 <br /> <br />2,050 <br />2,420 <br /> <br />37 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.