Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Schedule 3 - Distribution System - Fox Farm Road Area <br />Item Description Q,nty Unit Unit Total <br /> Price Price <br />1 8" 160 psi PVC pipe 3000 LF $ 8 $24,000 <br />2 6" 160 psi PVC pipe 2000 LF $ 5 $10,000 <br />3 Valves, buried <br /> 8" 1 Fa $ 550 $ 550 <br /> 6" 1 Ea $ 350 $ 350 <br />4 Hydrants with valve 5 Fa $1l00 $ 6,500 <br />5 PRV's 1" service 2 Fa $ 500 $ 1,000 <br />6 Connections. inc1d meter 10 Fa $ 300 $ 3,000 <br /> Schedule 3 Total = $44,400 <br /> <br />Project Cost <br /> <br />Total construction Schedules 1, 2, 3 <br />Contingency @ 15% <br /> <br />Price increase @ 10% (one year) <br /> <br />Land, first year debt service, misc <br />Total Project <br /> <br />= $309,250 <br />= 46,388 <br />= $355,638 <br />= 35.564- <br />= $391,201 <br />= 78.240 <br />= $469.442 <br />= 30,000 <br />= $500,000 <br /> <br />Engr, legal, admin @ 20% <br /> <br />25 <br />