<br />'"-. <br /> <br />SCHEDULE A <br /> <br />CDLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board dpproval of engIneering firm and engineering <br />agreement between engIneerIng firm and project sponsor. <br /> <br />2. Prepdration of detailed plans and specIfIcations for <br />authorized projects by consulting engIneering firm. <br /> <br />3. Approval of detaIled plans dnd specifications by Board <br />staff (plans and specifications for storage dams dnd <br />reservoirs must also be approved by State EngIneer.s <br />office). <br /> <br />4. Board staff approvai of bidding for the project. Board <br />staff present at bid opening for construction. <br /> <br />5. <br /> <br />Project sponsor may issue the notIce of award and the <br />notIce to proceed wIth construction to the contractor <br />(both notices must be approved by the Board staff before <br />they are Issued). <br /> <br />6. <br /> <br />~ <br />Conduct a pre-constructIon eonferenc~. ~Approval of <br />construction schedule by Bo~rd staff. <br /> <br />. ~l <br /> <br />Construction commences. The Board staff makes perIodic <br />Inspections during constructIon. All change orders must <br />be approved by the Board staff In advance and before any <br />constructIon on change Items can Commence. Emergency <br />items cleared by telephone. <br /> <br />8. The consulting engIneer certIfIes that the project has <br />been completed according to approved drawIngs dnd <br />specifIcatIons and arranges for fInal Inspection. <br /> <br />7. <br /> <br />. ~ ;f, <br />-''''-', <br /> <br />9. Final InspectIon and acceptance of as-built project by <br />BOdrd staff. <br /> <br />10. SubmIttal of as-built drawln~s to Board staff for <br />~approval and filIng. <br /> <br />; <br /> <br />.' <br />., <br />, <br />