My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00233
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153528
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />, <br /> <br />~ <br />STATE OF COLORADO <br />- <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br />721 State Centennial Building <br />, 313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 8&&,3441 <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Barry Ryan <br />~~cDonald <br />April 12, 1988 <br /> <br />Roy Romer <br />Governor <br />J. William McDonald <br />Director <br />David W. Walker <br />Deputy Director <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: Contract with the Ute Mountain Ute Tribe for the <br />Construction of the Towaoc Pipeline Project <br /> <br />When the Towaoc Pipeline Project was authorized, the Water <br />Conservation Board was also authorized by section 1(4), Chapter <br />230, Session Laws of Colorado 1986, to contract with the Ute <br />Mountain Ute Tribe for the construction of the project if the <br />Board is satisfied that the reguired work can ,be satisfactorily <br />performed. The Tribe, through its wholly owned subsidiary, the <br />Weminuche Construction Authority, does desire to construct the <br />project. Therefore, i have thoroughly evaluated the <br />Authority's gualifications and have concluded that it is <br />competent to construct the project. <br /> <br />Under the circumstances, I am prepared to proceed to enter <br />into a negotiated contract with the Tribe, the competitive <br />bidding processes of ArtiCle 92 of Title 24, CRS, having been <br />waived by the above cited authorizing legislation. The purpose <br />of this memorandum is to reguest you to: <br /> <br />(1) Prepare-the necessary contract between the Board and <br />the Tribe (Authority?), a draft of which as prepared <br />by MKE is enclosed, and <br /> <br />(2) Review and approve or modify the other enclosed <br />contract documents, which have also been prepared by <br />MKE as part of their work for us. <br /> <br />In order to meet our construction schedule, I need to have <br />the contract between the Board and the Authority executed and <br />completed by June 1, 1988. Accordingly, I would appreciate it <br />if you could furnish a draft contract to me for our review by <br />April 18, 1988. <br /> <br />Should you have any guestions about what the construction <br />of this project will entail, please feel free to call upon Nick <br />Ioannides of my staff. <br /> <br />May I thank you in advance for your assistance with this <br />contract. <br />JWM/gl <br />Enclosufes: as stated <br />cc: L01S Witte (w/out encs.) 6318E <br />
The URL can be used to link to this page
Your browser does not support the video tag.