My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00233
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153528
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />. <br /> <br />~\ MORRISON-KNUDSEN ENGINEERS, INC. <br />~ A MORRISON KNUDSEN COMPANY <br /> <br />112(1 LINCOLN STREET, SUITE 1200 <br />DENVER. COLORADO U.S.A. 80203 <br />PHONE; (303) 831-8200 <br /> <br />July 5, 1988 <br /> <br />Hr. Y. J. Headrick <br />. Eli vi si on of Hi ghltays - Di stri ct 5 <br />1,Iai ntenance Branch <br />214 West Sixth Street <br />Durango, Colorado 81301 <br /> <br />SUbject: TOWAOC MUHICIPAL PROJECT <br />Highway Construction Permit <br /> <br />Dear Mr. Headrick: <br /> <br />Based on ollr phone convel'sati on 1 ast week, lie deci ded to change the <br />pipeline crossings of State Higl1Hay 160 near the To~m of Towaoc. <br />O\'alling I~o. 49, Ilhich has been enclosed, indicates that one of the PYC <br />crossings has been eliminated because we decided not to replace the <br />exi sti ng pi pe. At the other crossi ng, we ~/ill encase the 4-i nch PYC <br />carriel' pipe ~/ith an 8-inch diar.1eter casing pipe I'Ihich has a lIall <br />thi ckness of 1/4 inch. The carri cr pi pc \till sit upon a redwood sl ed, <br />and a sand fi 11 er Iii 11 be used in the space betl'leen the casi ng and <br />carriel' pipe. <br /> <br />In addition, He have decided to install a 4-inch permastran pipe from <br />Towaoc to t,;ancos. Since part of the pipeline parallels the hi ghl'lay , a <br />copy of the alignment is enclosed for your information. Please amend <br />our pennit application to include pennission to construct this line on <br />the highllay right-of-l'Iay. The line I'/ill Cl'OSS the highway at the <br />location shOlto on the dralting. An 8-inch diameter casing pipe will he <br />used under the high~tay at the crossing. <br /> <br />Th,1I1X you for all oHi ng us to a ltel' our penni t appl icati on. If you have <br />any questions, please feel free to call me. <br /> <br />Very truly yours, <br /> <br />~E~ <br /> <br />Robel't E. Swain, P. E. <br />Projl)ct Manager <br /> <br />/\~"i~ <br />,<00; 1ft;> ~~ <br />(0 ~'~ <br />~ ~\)\. \9,'0'0 lP <br />CO> . ~. y.. .. ~ <br />\N .... st':.. "'~ <br />'(~ ~t. rfl\(I/~' <br />~....,." .fi,jl.,<l%()' G'IJ, <br />...."if " <q'l. .,,' <br />~<(ii.?lG9Z?~" <br />"'-"-- <br /> <br />RES/l j n :1931 H <br />Enclosures <br /> <br />cc: IHck Ioannides, C~/CB (1//0 encloslll'es) <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.