My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00233
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153528
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ :' <br />: <br /> <br />. <br /> <br />,. .~ <br /> <br />\ <br /> <br />. UTE MoUNTAIN UTE TR1B. <br /> <br />W eemin~c.he Construction Authority <br /> <br />Post Office Box AA <br />Towaoc, Colorado 81334 <br />nmHONIE (303) 56S-7.QD <br /> <br />s, <br /> <br />..' <br /> <br />RECEIVED <br /> <br /> <br />QieI ..-.: "- <br />LuI T~CaieI <br />.......72 <br /> <br />DEe 2 0 '89 <br />COWRAw WATER <br />CON~~^TION , <br />BOARD <br /> <br />. . <br /> <br />December 15, 1989 <br /> <br />Mr. Glenn Pruitt <br />Morrison-Knudsen Engineers, Inc. <br />22763 County Road G.2 <br />Cortez, Colorado 81321 <br /> <br />Subject: Towaoc Municipal Projects, <br />Division II Time Extension <br /> <br />Dear Glenn, <br /> <br />Due to numerous delays in Division II work that have been beyond our control <br />and not the fault of Weeminuche Construction Authority we request an extention <br />in the contract time for the Division II work. <br /> <br />It is the stated intent of the contract documents that Division II work could <br />start no later than December 31, 1988. The contract documents under Section 01012, <br />Contractor's Construction Schedule, Contractor shall not schedule to submit a <br />progress schedule, Contractor shall not schedule work on this part (Division III <br />of the project prior to December 31, 1988. Contractor will be provided the full <br />alignment by December 31, 1988." <br /> <br />During the construction of the Division I phase of the project in the late <br />Fall and early Winter of 1983 we became aware, thru discussions at meetings, that <br />the Colorado Water Conservation Board, in all probability, would not be able to <br />abide by their commitment to "provide the full alignment by December 31, 1988." <br /> <br />After starting the work in the Division I phase it has been our intent to <br />increase our work force to two crews and essentially have Division I work completed <br />by the latter part of December 1988, We would then move on with similar work in <br />an orderly manner into the Division II phase by December 31, 1988 without <br />interuption. <br /> <br />Our intended manner of addressing the Division II work did not occur. After <br />'. learning of the probability that Division II work would not be provided by December <br />31, 1988 we did not have justification to increase our work force for the Division <br />I work to the intended two crews. Work was continued on Division I thru early <br />1989 and ultimately completed on this phase on March 2, 1989 at which time most <br />of our project personnell were laid off and equipment was placed on standby. <br /> <br />The Colorado Water Conservation Board, because of unanticipated right of way <br />acquistion problems, did not provided any Notice To Proceed on Division II work <br />until May 8, 1989, At that time only 10,050 lineal feet became available for <br />construction of the approximately 62,000 lineal feet of pipeline in Division II. <br />EXHIBIT E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.