Laserfiche WebLink
<br />, <br /> <br />.' . <br /> <br />~ <br />. <br /> <br />\ <br />. <br /> <br />" <br /> <br />,"~ <br /> <br />The reduction in utilization OI personnel will be proportionate to the <br />average daily' direct cost of-each of these periods. <br /> <br />Percent of Reduced Activity to <br />Full Activity (See calculations in Section I) <br /> <br />54.73Y. <br /> <br />Project Supervisor, Bob Goffinett <br />Salary $710 per week x 7.29 weeks (51 days) <br />Payroll Taxes. and Insurance @ 30X <br />Health Insurance 257.41 per month x 1.7 months <br /> <br />5,175.90 <br />1,552.77 <br />437.60 <br /> <br />, <br /> <br />Project Engineer, Larry Darling <br />Salary $550 per week x 7.29 weeks <br />Payroll Taxes and Insurance @ 30Y. <br />Health Insurance 256.52 per month x 1.7 <br /> <br />4,738.50 <br />1,421.55 <br />436.08 <br /> <br />Total <br /> <br />13,762.40 <br /> <br />Calculations in Section I show that the Towaoc Municipal Project was <br />only operating at 54.73Y. of the level of activity durinq the time we <br />consider to be the less than fully efficient period. lbe difference <br />.between 100Y. for the fully efficient period and 54.73~ for the less <br />than fully efficient period amounts to 45.27Y. which is the basis OI our <br />claim Ior compensation for the salaries, payroll taxes and insurance, <br />and health insurance for the supervisory and engineering personnel. <br /> <br />Under-Utilized Project Personnel <br />$13,762.40 x 45.27Y. <br /> <br />6,230.24 <br />