My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00233
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153528
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t <br />UTE MOUNTAIN UTE TRIBE <br />Weeminuche Construction Authority <br /> <br />· RECEIVED MAY - t 1989 <br />, " <br /> <br />;0)i5~~/i\J.r;~;'~"1 <br />L;\.I~0\:.,.. C:;.;~'" <br /> <br /> <br />Post Office Box AA <br /> <br />Towace. Colorado 81334 <br />TELEPHONE '303) !W-7.t3Q <br /> <br />iitAY 0 4 '89 <br /> <br />Chid JKt HoUle <br />t.1l TnditiGIII.1 Chief <br />11I6-19n <br /> <br />'::O'..UI1i'\UV WATEri <br />,",fJrJS~P.1!"XiOi\1 <br />BOAR'" <br /> <br />May 1, 1989 <br /> <br />l1orrison-Kundsen Engineers, Inc. <br />12701 County Road 23 <br />Cortez, Colorado 81321 <br /> <br />Attention: Mr. Glenn Pruitt <br /> <br />Subject: Towaoc Municipal Project <br />Claim For Delay <br /> <br />Gentlemen: <br /> <br />On March 2, 1989, we provided written Notice 02 Claim in accordance <br />with the speci~ication's General Conditions, Section 00700-9.11. This <br />claim is submitted ~or compensation due to delay o~ Notice to Proceed <br />~or the Division II portion o~ our contract. <br /> <br />Our bid and contract is based on a pTogress plan that con~orms to the <br />contract documents with us ~irst peT~orming pipeline placement ~or the <br />Division I scope and then proceeding directly into Division II work. <br /> <br />Division II work was planned to staTt not later than January 2, 1989 <br />and would utilize an additional pipe excavating, laying , and back~ill <br />crew to assure completion o~ all work in areas that would be wet, or <br />subject to irrigation later in the season, Our intent was to get <br />across the areas where wet conditions could exist while these areas <br />were ~rozen. We planned to make the canal crossings and excavation in <br />irrigated ~ield and where crops would later be planted during the <br />winter months when impact would be minimal. When it became apparent to <br />us that there would be a delay in obtaining the right-o~-way, we <br />postponed the plan ~or an additional pipe laying crew and lengthened <br />the completion time ~or Division I pipe laying work which was <br />ultimately completed on March 2, 1989. <br /> <br />The contract documents under Section 01012, Contractor's Construction <br />Schedule Subsection 1.3 states in part the ~ollowing: "In order to <br />establish a basis ~or Contractor to submit a progress schedule, <br />Contractor shall not schedule work on this part (Division II) o~ the <br />project prior to December 31, 1988. Con~r~ctor wi~l be provided the <br />~ull alianment by December 31. 1988.. (emphasis provided) <br /> <br />EXHIBIT C <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.