Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Summary of Project Costs <br /> <br /> <br />Construction <br /> <br />$290,370 <br />(including 20% contingency) <br />$28,800 <br />(including 20% contingency) <br />$319,170 <br />$40,000 <br />$66,773 <br />$425,943 <br />$340,754 <br />($23,400) <br />($10,000) <br />$307,354 <br /> <br />Construction Engineering <br /> <br />Total Construction Costs <br /> <br /> <br />Estimated Design Engineering <br /> <br /> <br />Feasibility Study <br /> <br /> <br />Total Capital Expenses <br /> <br /> <br />80% of Total Capital Expenses <br /> <br /> <br />minus - Company's Feasibility Study Participation <br /> <br /> <br />minus - Small Dam Site Grant <br /> <br /> <br />CWCB Loan at 80% of Total Capital Expenses <br /> <br />E:\G&.LREPOR. WPD <br /> <br />VII <br /> <br />March 17, 1997 <br />