<br />r-' <br />~~ <br /> <br />--J!>'" <br /> <br />,'~.' .~ <br /> <br />parshall flume. Riprap slope protection is provided for downstream slope between the check <br />structure and control structure. <br /> <br />The recommended alternative for Oklahoma Check structure consists of removing the existing <br />structure and replacing it with a new concrete check structure. The components of the new check <br />structure would have the same dimensions used in the original check structure. The new check <br />structure would contain two components: an ogee weir control structure regulating the flow in the <br />Greeley and Loveland canal, and a new dual gate turnout structure diverting flow into a canal lateral. <br />As shown in Figures IV-4 and IV-S, the control structure would remain 22-foot wide and use an ogee <br />crest weir to provide flow regulation. The wooden bridge deck would be replaced with a simple span <br />concrete bridge deck with handrails, supported on either side by 10-foot high abutments, A 10~foot <br />high wall separates the control structure and the turnout structure along the upstream face. The <br />turnout structure has two 18-inch slide gates on the upstream face ofa 6-foot wide outlet structure <br />to regulate flow. The structure is spanned by a 4-foot-wide by 8-foot-long single span concrete <br />bridge deck with handrail on the downstream side, The bridge is supported by 6-foothigh abutments, <br /> <br />The funding to design and construct Equalizer Dam and Reservoir project is being requested <br />during the 1998 loan period. Equalizer Dam and Reservoir are owned by the Greeley and Loveland <br />Company. Therefore the project will be paid for by assessing Greeley and Loveland shareholders and <br />not Seven Lakes or Lake Loveland shareholders, The summary of the project costs for Equalizer <br />Dam and Spillway is listed in the following table, The Company is seeking funding from CWCB <br />for 80 percent of total capital expenses to design and construct Eqlializer Dam and Spillway. The <br />remaining 20 percent will be paid through water assessments. Construction could begin in September <br />1998 with completion by November 1998. . <br /> <br />E:\G&LREPOR. WPD <br /> <br />VI <br /> <br />Man:h17.1~1. <br /> <br />;;1- <br />I~ <br />I <br />'I <br />I <br />I <br />.'1~ <br />I, <br />I.., <br />'I,' <br />I' <br />." <br />'I' <br />I <br />I,; <br />lit; <br />I'~: <br /> <br />" <br /> <br />~I' <br />.' 1'~1," <br /> <br />, :I':j <br />.; r:'f;.~ <br />'i <br />'. ,,; <br />., <br />