Laserfiche WebLink
<br />TABLE V-D <br /> <br />Evaluation Matrix for Raw Water Supply <br /> <br />Alt. A-I Alt. A-2 <br />Pipeline Concrete T -ining <br /> <br />Non-Monetary Factors <br /> <br />Tmpact on Environment: <br />1. Man-Made (5)* <br />2. Natural (5) <br />3. Social Structure (5) <br /> <br />3 <br />3 <br />3 <br /> <br />3 <br />3 <br />3 <br /> <br />Institutional Considerations: <br />4. Impact on Water Rights (5) <br />5. Land or ROW Req'd (5) <br />6. Permits Required (5) <br />7. Effect on Growth (5) <br />8. Conflict w/Bylaws (5) <br />9. Salinity Control (5) <br />10. Water Savings (5) <br />11. Safety & Liability (5) <br />12. Ease of Use (5) <br /> <br />3 <br />3 <br />3 <br />3 <br />3 <br />5 <br />5 <br />5 <br />4 <br /> <br />3 <br />3 <br />3 <br />3 <br />3 <br />4 <br />4 <br />2 <br />3 <br /> <br />Technical Prohlems: <br />13. Construction Period (5) <br />14. Unstable Material (5) <br />15. Life Cycle Period (5) <br /> <br />3 <br />3 <br />-5. <br /> <br />2 <br />3 <br />...2 <br /> <br />Subtotal (75) <br /> <br />54 <br /> <br />44 <br /> <br />Monetary Factors (75 Points) <br /> <br />Initial Cost (40) <br />Annual Cost (35) <br /> <br />30 <br />25 <br /> <br />20 <br />15. <br /> <br />Subtotal (75) <br /> <br />55 <br /> <br />35 <br /> <br />Total (150) <br /> <br />109 <br /> <br />79 <br /> <br />*Designates points for 'perfect' score <br /> <br />V-IS <br /> <br />Alt. B-1 <br />No Action <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3 <br />3 <br />3 <br /> <br />3 <br />3 <br />4 <br />3 <br />3 <br />1 <br />1 <br />2 <br />2 <br /> <br />5 <br />5 <br />1 <br /> <br />31 <br /> <br />40 <br />15. <br /> <br />55 <br /> <br />86 <br />