My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153321 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153321 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:41:10 AM
Creation date
10/5/2006 11:44:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153321
Contractor Name
Ridgway, Town of
Contract Type
Loan
Water District
60
County
Ouray
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />Alternate II - Alternate II is to be considered as the last resort. <br />Primary concerns are for the pump costs versus the cost per capita <br />for_water consumption. Noted for long periods of electrical failure, <br />the service area would be totally dependent on the treated water <br />storage tank for water. As the lines become older and exfiltration <br />increases, the pumping cost will be reflective of this. The quality <br />of water is not as good as the other four alternatives, nor does the <br />quantity exist at all times. <br /> <br />1 <br /> <br />I <br /> <br />1 <br /> <br />I <br /> <br />, <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />1 <br /> <br />1 <br /> <br />I <br /> <br />37 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.