Laserfiche WebLink
<br />\ <br />I <br />I <br /> <br />[ <br /> <br />amendment as though they were expressly rewritten. <br />incorporated. and included herein. <br /> <br />2. The only modifications. alterations. or changes in the <br />Original Contract shall be that Exhibit A and paragraphs <br />B.II. D.I.. J. and N. shall be deleted and in their place <br />Attachment B and the following paragraphs shall be <br />inserted: <br /> <br />B. The Contractor agrees that it shall: <br /> <br />11. Repay to the State the total principal sum of One <br />Million Two Hundred Thirty-Eight Thousand Dollars <br />($1.238.000), which includes the project loan amount and <br />the Sixty-Thousand-Dollar ($60.000) feasibility report <br />amount. together with interest at the rate of five <br />percent (5\) per annum. said repayment to be made in <br />constant annual installments of Seventy-Two Thousand One <br />Hundred Fifty Dollars and Sixty-Four Cents ($72,150,64)/ <br />each. for forty (40) years. as shown in Attachment B. ~ <br />attached hereto and incorporated by reference herein. <br />which first installment shall be due and payable on <br />December 1. 1989. and yearly thereafter until the entire <br />principal sum shall have been paid. However. in the <br />event the Contractor does not draw funds commencing on <br />the date specified in paragraph D.l.a. below. the <br />obligation to repay shall be postponed for the same <br />number of months as the Contractor delays in drawing <br />funds. Said installment payments shal~ be made payable <br />to the COlorado Water Conservation Board.. payable at the <br />offices of said Board in Denver. Colorado: <br /> <br />D. The State agrees that it shall: <br /> <br />1. Loan to the Contractor for the construction of the <br />project an amount not to exceed One Million One Hundred <br />Seventy-Two Thousand Dollars ($1.172.000), Said One <br />Million One Hundred Seventy-Two Thousand DoLlars <br />($1.172.000) shall be made available to the Contractor in <br />accordance with the following terms and conditions: <br /> <br />a. Beginning with the monthly periOd commencing June 22. <br />1988. and for every month thereafter until said project <br />has been completed. the Contractor shall prepare. with <br />the assistance of the Consultant referred to in paragraph <br />B.l. above. an estimate of the funds required for project <br />construction during that month and shall forward said <br />estimate to the State not less than fifteen (15) days <br />prior to the beginning of such month. <br /> <br />b. Upon receipt and approval by the State of such <br />monthly estimate. the State will. within forty (40) days <br />from the receipt of such estimate. pay over to the <br />Contractor the amount of the monthly estimate or such <br />portion thereof as has been approved by the State. <br /> <br />c. No payments will be made under this contract unless <br />and until the project plans and specifications referred <br />to in paragraph B.l. above are approved by the State in <br />writing. <br /> <br />d. Project construction costs eligible for payment by <br />the State shall be limited to the cost of: <br /> <br />(1) Preparing final designs and specifications for the <br />project. <br /> <br />(2) Preparing bid and construction contract documents. <br /> <br />Page ~ of ~ Pages <br />