Laserfiche WebLink
<br />., <br /> <br />/J C ,>:;r:; ,p-:>,;;'&: <br />Ot.." .':::NT OR ACt:::'KY :o.:U.\UIUI. <br />34-04-00 <br />COf'lRAC1 ROUTlNC f\UMBEH <br />5? :}1/.'i <br />$538,000 Additional <br /> <br />,-". <br /> <br />Form 6-AC-02A fR S/8Sl <br />W/FRPB <br />Gurley Darn <br /> <br />APPENDIX A <br /> <br />AMENDMENT #1 <br />-PROJECT <br />CONTRACT <br /> <br />nlls CONTRACT. made- this 'I A day of 'J:J/n.,..t1"'3-L,,~ 198 .E:., bv and belween rhe <br />Stale of Colorado (or Ihe u!>t and benefi, of Iile l)epartmenl of"1 Natural Resources <br />(Colorado Water Conservation Board), <br />hereinaher rt"ferred (0 as the State, and'2 the Farmers \'1ater Qevelopment CamD~ <br />Box 387, Norwood, CO 81423, <br />hC'reinaher referred 10 a!o the cor1lraclur.!Contrac"tor. <br /> <br />WJ-IEREAS. aUlhonry t'll:i5Is in the Law and Funds have been budi!tled. appropriated and olherwise made <br />available and a sufficienl unencumbered balance" thereof remains available for paymeRI in Fund ~umber 4008 <br />GJl ACCflunr Number 53 70X . Conlracl Encumbrance NumberC1S 3514 ; and <br />ABL Account No, 13700, Org, Unit 77-77-777, <br />WHEREAS. reLluired aplnllv~ance and coordinalion has been accomplished from and wilh appropriale <br />.llSencies: and <br /> <br />WHEREAS. a contract was entered into on June 22. 1988, <br />Contract Encumbrance Number C-153514 (the Original Contract). <br />between the State aod the Contractor; and <br /> <br />WHEREAS. foundation grouting was one of the construction <br />requirements for this project; and <br /> <br />WHEREAS, because of the unusual grout ta~es, the <br />Construction Firm has to work three shifts SlX days a week to <br />be able to handle the additional work; and <br /> <br />WHEREAS. because of the additional worKiD9 hours required <br />of the Constructiop Firm. additional engineering is also <br />required of the Copsultant; and <br /> <br />WHEREAS, the loan amount of Seven Hundred Thousand Dollars <br />($700.000) has beeP authorized for this project; and <br /> <br />WHEREAS. the spid loan may be increased bY ". ..such amounts. <br />if any. as may be justified by reason of. ..changes as required <br />by final engineering drawings and specifications.. ..": and <br /> <br />WHEREAS. onsite conditions have made changes in engineering <br />drawings and specifications necessary in order to respond to <br />the unusual grout takes at the Gurley Reservoir; and <br /> <br />WHEREAS. this additional work will cost the Contractor <br />additional money to repair the project; and <br /> <br />WHEREAS. the consultant has estimated the total additional <br />cost for the project to be Five Hundred Thirty-Eight Thousand <br />Dollars ($538,000), making the total project cost One Million <br />Two Hundred Thirty,Eight Thousand Dollars ($1,238,000); and <br /> <br />WHEREAS. the contractor. through a Resolution of its Board <br />of Directors. has agreed to this additional project cost; and <br /> <br />WHEREAS. repayments are in direct proportion to the amount <br />of money loaned: and <br /> <br />WHEREAS. the Contractor. through the above-mentioned <br />Resolution. has agreed that it can afford and will make the <br />additional payments required by this contract amendment. <br /> <br />NOW THEREFORE, it is hereby agreed that: <br /> <br />1. This contract amendment is a supplement to the Original <br />Contract (Attachment A). which is by this reference yI <br />incorporated and made a part hereof: and all the terms. <br />conditions. and provisions thereof. unless specifically <br />modified herein. are to apply to this contract <br /> <br />J95-5}{1l-1O'14 <br /> <br />8531.E <br /> <br />Pa~e I of --2.. pa!!e~ <br /> <br />APPENDIX A <br />