Laserfiche WebLink
<br />I <br />] <br /> <br />) <br /> <br />". <br /> <br />b, Sizing criteria for canal cross drainage culverts or structures <br /> <br />will be prepared should they be required in this project. <br />c, The number and sizes of the pumping units will be investigated to <br />provide ample flexibility in meeting varying demands, <br /> <br />d. The availability and source of required construction materials <br /> <br />will be addressed in the report, <br /> <br />D. Right-of-Way. The right-of-way requirements will be reviewed, noting <br />available right-of-way and what additional right-of-way will be required and <br />proposals for the acquisition of the same, <br /> <br />7. Cost Estimate <br /> <br />1 <br /> <br />A. Costs of Construction <br /> <br />The chapter will include: <br /> <br />a. Derivation of unit construction costs and pertinent factors <br /> <br />affecting estimated construction costs. <br />b. A summary of estimated project costs. <br /> <br />c. An allowance for future cost escalations that are expected to <br /> <br />occur between the date of the estimate and the award of the construction <br /> <br />contract, This allowance will be specifically identified in the cost summary as <br /> <br />"Projected Price Increase." <br /> <br />d. An estimate of other project costs will be considered, such as <br /> <br />engineering, administration, and the Owner's contribution. <br /> <br />B, Fund Requirement Schedule. The annual fund requirements by fiscal <br /> <br />years for each of the years of the construction period. <br />C, Emergency Operating Fund. A description of the Town of Frederick's <br /> <br />plan to finance extraordinary costs beyond the scope of normal operation, main- <br /> <br />tenance and replacement costs. <br /> <br />-4- <br />