My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00210
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:43:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153325
Contractor Name
West Divide Water Conservancy District
Water District
0
County
Garfield
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />, <br /> <br />'. <br /> <br />ATlACHMEIH "A" <br />June 2, 1980 <br /> <br />CHAPTER III - LAND (Continued) <br /> <br />development and the projection of the total area of M & I <br />land use that is anticipated to develop during the loan re- <br />payment period. Item 4.a, Land Classification and other <br />references to crops or irrigated areas are deleted from <br />this segment: <br /> <br />., <br /> <br />Lump Sum. .... $ 1,830.00 <br /> <br />CHAPTER IV - WATER <br /> <br />Development of the data required by the Guidelines for <br />M & I uses only without any consideration of raw water <br />storage reservoirs or agricultural (irrigation) water <br />requirements: <br /> <br />Lump Sum ..... $ 7,010.00 <br /> <br />CHAPTER V - PLAN OF DEVELOPMENT <br /> <br />Development of the physical plan considering Items <br />6.a,(2) and 6.a.(5) only without any requirement for <br />.Item 6.b. Geologic Investigations or 6.e. Drainage. <br />All references to storage reservoirs, spillways, canals <br />or other agricultural facilities are also deleted: <br />Lump Sum ., ... $ 5,675.00 <br /> <br />CHAPTER VI - ESTIMATED COSTS <br /> <br />Preparation of all of the data listed in the Guidelines <br />for this segment of the work as they apply to the pro- <br />posed project: <br /> <br />Lump Sum ..... $ 1,930.00 <br /> <br />- 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.