Laserfiche WebLink
<br />-. <br /> <br />, <br /> <br />'. <br /> <br />nl Inl..-lU"IL.1\ I '1- <br />The David E. Fleming Company <br />June 2, 198D . <br /> <br />WEST DIVIDE WATER SUPPLY PROJECT <br />DETAILED PROPOSAL <br /> <br />All references are to "Part B - Outl ine for Feasibility Reports", <br />Guidelines, 1978, Colorado Water Conservation.Board, Fifteen copies <br />of the final report will be furnished." <br /> <br />GENERAL <br /> <br />Coordination of work with the West Divide Water Conservancy <br />District and the Colorado Water Conservation Board, prefacing <br />material for the feasibility report, and attendance at one <br />public meeting of the Colorado Water Conservation Board for <br />presentation of the feasibility report: <br /> <br />lump Sum ..... $ 1,620.00 <br /> <br />CHAPTER I - GENERAL INFORMATION <br /> <br />Preparation of the project map and Chapter I of the report <br />containing all of the items listed in Items 2.a., 2.b. and <br />2.c. (1) of the Guidelines with no consideration of irrigable <br />lands: <br /> <br />lump Sum. .... $ 1,225.00 <br /> <br />CHAPTER II - THE DISTRICT <br /> <br />This material will be furnished by the West Divide Water <br />Conservancy District at its own expense and included in <br />the report without charge. <br /> <br />CHAPTER III - lAND <br /> <br />Preparation of the service area map called for in Item 4.b. <br />and those portions of Item 4.c. which denote the boundaries <br />of the service area, the areas of present municipal-type <br /> <br />- 1 - <br />