Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Conclusion <br /> <br />Based on my research I would conclude that the West Divide Water Conservancy District, <br />from September 1, 1980 to September 1, 1990 did not construct any of the water <br />improvements identified above within the 10-year time frame specified in Contract No. C- <br />153484, and therefore has no obligation to pay the State the Contract specified sum of <br />$14,178.35. <br /> <br />The West Divide Water Conservancy District currently has one Loan Contract with The <br />Colorado Water Conservation Board, C153592, for the rehabilitation of the Alsbury Dam, <br />which was initiated in 1991 and completed in January of 1997. This project is not related to <br />any of the improvements indicated within the report. Additionally, attached is a letter from <br />the West Divide Water Conservancy District Administrative Assistant, Janet Maddock, stating <br />that the District did not construct any related water project within the 10-year time period <br />specified within the Contract. <br />