Laserfiche WebLink
<br />: <br /> <br />~. ~. <br /> <br />. <br /> <br />. <br /> <br />A cash flow table will be prepared, showing the pay-out schedule for <br />constructi on and operati on, compared to the returns from revenues. <br />Requirements for interest, operation and reserves will also be included. <br /> <br />The elements of this analysis will be included in Chapter VIII of the <br />feasibility report. <br /> <br />10.0 Task 9 - Present Concl usi ons. and Recollll1endati ons <br /> <br />An additional chapter in the feasibility report will be added to present an <br />overview of the physical and financial components of the project, and to <br />outl i ne the steps requi red for impl ementati on. There may be other time or <br />cost components involved with the transfer of water rights. These will be <br />addressed in this section of the report. <br /> <br />No environmental analysis will be prepared with this report, yet any potential <br />environmental impacts of significance identified during the feasibility study <br />wi 11 be noted.. <br /> <br />-6- <br />