Laserfiche WebLink
<br />II <br />I <br />I <br />I I C <br />I D <br />I <br />I <br />E <br />I F <br />I G <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />cp <br /> <br />Table 3 <br />GEOTECHNICAL ENGINEERS INC. <br /> <br />E NuL E WOOD. COLORADO <br /> <br />OUANTITY AND COST ESTIMATE SHEET <br />Option 2 <br />Soil-Cement Overtopping Protection <br /> <br />2 <br /> <br />OF <br />86158 <br /> <br />2 <br /> <br />BY KAF <br /> <br />DATE 11/26/86 <br /> <br />SHEET <br />JOB NO, <br /> <br />CHKD. BY _ DATE <br /> <br />ITEM NO. ITEM QUANTITY UNIT UNIT SOURCE( II AMOUNT <br /> COST <br /> Construction Cost Contingencies $77,865 <br /> (2:% of Item A) <br /> Projected Price Increase for <br /> 1988 Construction <br /> 1988 Engineering (6%) 1,500 <br /> 1988 Construction (4%) 14,220 <br /> Subtotal 15,720 <br /> Interest During Construction 0 <br /> Feasibility Study 36,000 <br /> Bond Issue Expenses 20,000 <br /> SUMMARY OF ESTIMATED PROJECT COSTS $600,000 <br /> Items A, B, C, D, E, F, and G <br />(II <br />SOURCES: (01 <br /> (bl <br /> (el <br />