My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00202
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:43:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153474
Contractor Name
Oak Creek, Town of
Water District
0
County
Rio Blanco
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I A <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I B <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />BY <br /> <br /><P <br /> <br />TABLE 3 <br />GEOTECHNICAL ENGINEERS INC <br /> <br />EI\,jGl-E WOOD . CC:X.J~)R~OO <br /> <br />KAF <br /> <br />DATE 11/26/86 <br /> <br />QUANTITY AND COST ESTIMATE SHEET <br /> <br />Option 2 <br />Soil Cement OvertoDDino Protection <br /> <br />SHEET 1 OF 2 <br />JOB NO. 86158 <br /> <br />CHKD. BY _ DATE <br /> <br />ITEMNQ. <br /> <br />ITEM <br /> <br />Construction Costs <br />MobilIzatIon/Demobilization <br />(including access road improve- <br />ment) <br /> <br />2 <br />3 <br /> <br />Clearing and Grubbing <br /> <br />Topsoil Stripping and <br />Stockp i ling <br /> <br />4 <br />5 <br /> <br />Open-cut Excavation <br /> <br />QUANTITY UNIT <br /> <br />g~!J SOURCElI ) <br /> <br />0.60 Acre $3950 (a) <br /> <br />10,370 yd3 $1.90 (a) <br />16,900 yd3 $3.00 (a) <br /> <br />Mixing, Placing, and Compacting <br />Soil Cement Overtopping Protection 5,610 yd3 $19.00 (b) <br /> <br />6 <br /> <br />Furnishing Cement for Soil <br />Cement Overtopping Protection <br /> <br />Furnishing and Constructing <br />Soil-Cement Under Drain System <br /> <br />Furnishing and Installing Crest <br />Raising Precast Concrete <br />Retaining Walls <br /> <br />7 <br /> <br />8 <br /> <br />9 <br /> <br />840 tons $90.00 (b) <br /> <br />280 Yd3 $55.40 (a) <br /> <br />690 l.ft $12.00 (c) <br /> <br />Placing and Compacting Random <br />Fill for Crest Raise 1,000 yd3 $2.70 (a) <br /> <br />Disturbed Area Reclamation 3 Acre $9655 (a) <br />Subtotal <br /> <br />10 <br /> <br />11 <br /> <br />Engineering and Administration <br /> <br />Final Engineering Designs of <br />Modification <br /> <br />12 <br /> <br />Construction Bid Review and <br />Consu Itation <br /> <br />13 <br /> <br />Construction Quality Control <br /> <br />Subtotal <br /> <br />(I) <br />SOURCES: ta) Means Site Work Cost Data <br />(0) Portland Cement Association <br />(e) Vaughn Concrete Products <br /> <br />AMOUNT <br /> <br />$ 45,000 <br /> <br />2,370 <br /> <br />19 ,700 <br />50,700 <br /> <br />106,590 <br /> <br />75,600 <br /> <br />15,510 <br /> <br />8,280 <br /> <br />2,700 <br /> <br />28,965 <br />$355,415 <br /> <br />50,000 <br /> <br />15,000 <br /> <br />30,000 <br />95,000 <br /> <br />Note: See detailed calcula- <br />- <br />tions for derivation of unit <br />costs. Unit costs include _. <br />':'nn+~'~+n~lc ',r1 R. ",.n+i+ <br />
The URL can be used to link to this page
Your browser does not support the video tag.