My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00202
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:43:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153474
Contractor Name
Oak Creek, Town of
Water District
0
County
Rio Blanco
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />-33- <br /> <br />included an allowance for price increases for 1988 construction and en9i- <br />neering construction quality control services. The increase allowance for <br />engineering cost is 5 percent and is based on a survey of salary increases <br />over the past five years by the American Society of Civil Engineers (ASCE). <br />The increase allowance for construction costs is 4 percent and is based on <br />information obtained from discussions with a large construction management <br />company. <br /> <br />Interest During Construction - Pursuant to instructions from the ewCB <br />regarding the timing for the availability of matching funds, the financial <br />plan for the project provides that funding for 100 percent of project costs <br />will be secured by June 30, 1987, approximately one year before the start of <br />construction. Accordingly, there is no separate cost item for interest during <br />construction. <br /> <br />Bond Issue Expenses - The Town's bond counsel, Hanifen-Imfhoff, Inc., has <br />provided an estimated financin9 plan for a 1987 general obligation water bond <br />issue with a total par amount of $285,000. Based upon Hanifen-Imhoff's <br />financing plan, these funds would be used as follows: <br /> <br />Net Proceeds of Bond Issue <br />Final Design (1987) <br />Construction Costs (1988) <br /> <br />$ 32,500 <br />232,500 <br /> <br />$265,000 <br /> <br />Bond Issue Expenses (1987) <br />Legal Expense <br />Issuing Expenses <br />Underwrit i ng <br />Miscellaneous <br /> <br />$ 5,000 <br />2,500 <br />9,975 <br />2,525 <br /> <br />$ 20,000 <br />$285,000 <br /> <br />Par Amount of Bonds <br /> <br />The expenses of $20,000 would be paid directly from the proceeds of the bond <br />issue. This amount has been included in the estimated total project cost. <br /> <br />Summary of Estimated Project Costs - A summary of estimated project costs <br />for the preferred Option 2 is given in Table 3. Included in this table are <br />estimated quantities, unit costs, source of the unit cost estimate, and amount <br />of Item A - Construction Costs; Item B - Engineering and Administration Costs, <br />Item C - Construction Cost Contingency; Item D - Projected Price Increase for <br />1988 Construction; Item E - Interest During Construction; and Item F - Payback <br />of CWCB Loan for Feasibility Report. The total estimated project cost <br />including all of the above items is $600,000. <br /> <br />V.2 Fund Requirement Schedule <br /> <br />The estimated schedule for completion of all work required for this pro- <br />ject, including the fund requirement schedule, is shown on Figure 11. <br />Indicated on the schedule are funding requirements from the CWCB, and <br />corresponding funds to be obtained from the sources including general obliga- <br />tion municipal bonds or 9rants. <br />
The URL can be used to link to this page
Your browser does not support the video tag.