My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153167 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153167 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:42 PM
Creation date
10/5/2006 11:43:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153167
Contractor Name
Dove Creek, Town of
Contract Type
Loan
Water District
32
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />II <br /> <br />I <br /> <br />Purpose of Report <br /> <br />The primary purpose of this report is to provide information <br /> <br />on the alternative means of developing adequate sources of water <br /> <br />to supply the Town of Dove Creek and the surrounding rural area. <br /> <br />I <br /> <br />I <br />I <br /> <br />One proposed alternative is to obtain treated water from <br /> <br />the Town of Dolores and transmit it through the Montezuma Water <br /> <br />Company system, with storage facilities at pleasant View and Dove <br /> <br />I <br /> <br />Creek. <br /> <br />I <br /> <br />Another proposed alternative is to develop and divert Dolores <br /> <br />River water when the river is high. This water would be diverted <br /> <br />directly from the river near the location of the wells and present <br /> <br />pump station, pumped through the present flow line to a raw water <br /> <br />storage reservoir near Dove Creek, and then treated for use as <br /> <br />needed. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />The Town of Dove Creek has a critical water shortage for <br /> <br />2 to 3 months each fall. To eliminate this situation it will <br /> <br />be necessary for the Town to construct the new facilities during <br /> <br />the spring and early summer of 1977. It will be necessary for <br /> <br />the Town to either construct a supply line from Pleasant View <br /> <br />and purchase treated water, which will be referred to as Alternate <br /> <br />Number One in this study; or construct a raw water reservoir and <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />treatment plant at Dove Creek to furnish water during the periods <br /> <br />when the present wells are inadequate to meet the Town's needs, which <br /> <br />will be referred to as Alternate Number Two. <br /> <br />I <br /> <br />I <br /> <br />il <br /> <br />I - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.