My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153167 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153167 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:42 PM
Creation date
10/5/2006 11:43:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153167
Contractor Name
Dove Creek, Town of
Contract Type
Loan
Water District
32
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Alternate Number One <br /> <br />Town of Dolores - Treatment <br /> <br />The Town takes the water from the Dolores River into a <br /> <br />small settling <br />pressure filter <br /> <br />pond, <br />with <br /> <br />then runS the water through a rapid sand <br /> <br />a capacity of 1,100 gallons per minute, <br /> <br />and then into <br /> <br />the <br /> <br />Town's distribution system. The Town has steel <br /> <br />storage reservoirs with a combined capacity of 330,000 gallons. <br /> <br />The Town of Dolores has approximately 340 taps on the system. <br /> <br />Water is delivered to the Montezuma Water Company through a master <br /> <br />meter near the south side of Town. <br /> <br />Montezuma Water Company <br /> <br />When the system was first started in 1968, it had 702 taps. <br /> <br />It has since grown to 1,270 taps. On the initial system the water <br /> <br />rates were $10.00 for 3,000 gallons minimum and reduced from $1.50 <br /> <br />per 1,000 gallons down to $0.50 per 1,000 gallons for all water over <br /> <br />30,000 gallons per month. The current rates are 3,000 gallons minimum <br /> <br />at $16.25 plus $1.60 per 1,000 gallons for all water used over <br /> <br />the 3,000 gallons per month. The current average annual usage is <br /> <br />5,000 gallons per month per tap or a system average of 6,350,000 <br /> <br />gallons per month. The maximum monthly use for the system in 1975 <br /> <br />was 7,528,000 gallons. <br /> <br />III - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.