My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153167 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153167 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:42 PM
Creation date
10/5/2006 11:43:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153167
Contractor Name
Dove Creek, Town of
Contract Type
Loan
Water District
32
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Rights <br />The Town of Dove Creek water rights are as follows: <br /> <br />1. <br /> <br />Dolores River, through the Dove Creek supply line and <br /> <br />pump station for 0.39 cubic feet per second, appropria- <br /> <br /> <br />tion date of July 16, 1951 and adjudication date of June <br /> <br /> <br />11, 1968, and has river basin Number 129. <br /> <br />2. <br /> <br />Dolores River, through the Dove Creek supply line and <br /> <br />pump station for 0.69 cubic feet per second, conditional, <br /> <br />appropriation date of July 16, 1951 and adjudication date <br /> <br />of June 11, 1968. Of this decree, 0.31 cubic feet per <br /> <br />second was made absolute August 17, 1972, thereby leaving <br /> <br />0.38 cubic feet per second conditional. <br /> <br />The Montezuma Water Company water rights are as follows: <br /> <br />1. <br /> <br />Montezuma Water Company has purchased 10 cubic feet per <br /> <br />second of Main Canal No. 1 and 2 with an adjudication <br /> <br />date of March 22, 1963 and appropriation date of December <br /> <br />31, 1885, which has a river basin priority Number 101, <br /> <br />from the Montezuma Valley Irrigation Company. As a <br />further consideration in the purchase agreement, Monte- <br /> <br />zuma Valley Irrigation Company agrees that in the event <br /> <br />such direct flow should be insufficient to insure Monte- <br /> <br />zuma Water Company the receipt of 10 cubic feet per <br /> <br />second of water for delivery to or at its point of <br /> <br />II - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.