My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153167 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153167 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:42 PM
Creation date
10/5/2006 11:43:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153167
Contractor Name
Dove Creek, Town of
Contract Type
Loan
Water District
32
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />There are 329 in-town taps on the system. All taps are <br /> <br />metered except for the public buildings and entities, such as the <br /> <br />clinic, courthouse, and fire station. In addition to the in-town <br /> <br />service, the Town has 16 rural metered taps and through a public tank <br /> <br />loading dock they serve approximately 250 additional rural families <br /> <br />surrounding Dove Creek. When the Town has water available, they <br /> <br />also furnish water to drilling and mining companies operating <br /> <br />in the Dove Creek area. <br /> <br />The average usage has been 100,000 gallons per day with <br /> <br />the peak month being 200,000 gallons per day. However, if sufficient <br /> <br />water was available, the peak monthly usage probably would have <br /> <br />been 300,000 gallons per day. <br /> <br />The Town of Dove Creek has now reached a critical need to <br /> <br />obtain an adequate source of water to supply the Town. As a result <br /> <br />Morcan Engineering Company has been authorized to prepare this report <br /> <br />to evaluate the demand and show the means of developing all known <br /> <br />alternative sources of supplying additional water to the Town until <br /> <br />the Dolores Project is constructed. <br /> <br />I - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.